Change channel
English
Supplier
Buyer
Help
Apps
Rules

Aus/Nz Standard Galvanized Scaffolding for Outdoor Construction

inquiry

FOB Price:
Negotiable | Get Latest Price
Min.Order Quantity:
1 Set / Sets
Supply Ability:
1000 Set / Sets per Month
Port:
shanghai
Payment Terms:
T/T L/C D/P D/A Credit Card PayPal Cash Escrow Other
Delivery Detail:
5 days
Aus/Nz Standard Galvanized Scaffolding for Outdoor Construction metal Fixed Multi-Pole Scaffolding Combined Scaffolding Floor Type Scaffolding Full Scaffolding External Scaffolding Attached Lifting Scaffolding Scaffolding frames Building Scaffold Hot DIP Galvanized Q235, Q345, Galvanized Steel, Alloy metallic as Per Customer's Requirement 10 Tons Building, Mall, Factory, Pavilion 25-40 Days OEM/ODM in Bulk with Pallet Durable, Easy to Assemble OEM/ ODM Logo in Bulk with Pallet AUS/ NZ standard Jiangmen Product Description Hot Dip Galvanized Kwikstage Scaffolding System under AUS/NZ  standard for outdoor building construction:



Feature:

1. Material: Steel or Aluminium Alloy at customer's requirement;

2. Hop Dip Galvanized, durable for outdoor usage

3. Top quality and reasonable price

4. Easy to Assemble,Flexible

5. Various Sizes, Colours available at customer's design

6. Packaging: In bulk with metal Pallet

7. OEM Orders are welcomed

8. Own inspection team for quality control, sending detailed inspection report before shipment

9. Other Steel Construction projects available:  Stairs, Handrail, Scaffolds, Screening, Fence, Door frame, etc.

Packaging & Delivery:

Packaging Detail: In Bulk with Pallet
Lead Time: 20-25 working days



 FAQ:
 
1. Q: Can you make our custom brand logo?
   A: Yes, we accept OEM/ODM service.


2. Q: Can you offer free sample?
   A: Sample fee would be needed for our sample production, but money will be returned if you place order with us. Freight Charge for sample delivery would be collected on your side.

3. Q: How long to make a sample ?
   A: 15-30days depending on the design.

4. Q: How about lead time?
   A: Normally around 20-35 days upon order /confirm/iation.

5. Q: Can you offer me a discount?
   A: Cost would be lower depending on quantity, usually  the more you order the cheaper we offer.

6. Q: What about your payment term?
 A: For your first order, we accept 30%TT down payment only, the rest TT/LC at sight. For future order, other payment terms would be available upon discussion.

7. Q: Can we visit your factory?
 A: Certainly, customers are always welcomed to visit. Please make an appointment in advance.

8. Q: How far away your factory?
 A: Our factory is located in Jiangmen city, Guangdong, China. It is quite closed to Guangzhou/Shenzhen/Zhongshan/Zhuhai/Dongguan. It would take less than 2 hours by driving from Guangzhou Airport to our factory.

9. Q: Where the near ports can be chose?
 A: Jiangmen Port/Zhongshan Port/Huangpu Port/Nanshan port/Yantian Port,etc.

10. Q: Other more question?
 A: Please contact us by email if you have any question.
Contact with Supplier
* Title
* Content
Company
* Name
* Telephone
*Email
QQ
Ali IM
* Question
* Captcha  
   Available today 30 times    Currently sent times    Available send times
Product Categories for this supplier
  • none

Aus/Nz Standard Galvanized Scaffolding for Outdoor Construction

Quantity
1000 Piece
Products Cost
inquiry
Area
Chinaguangdongjiangmen
Huiye Hardware & Electrical Equipment Company Ltd.
Manufacturer/Factory,Trading Company
Chinaguangdongjiangmen 1Years

Response Rate: High

Avg Response Time: 24–48 h

Business Type:Manufacturer/Factory,Trading Company